Shop online with FREE UK shipping and fast International shipping * terms apply

Long Lead Prism Chandelier Drops

Product code: 4150

£22.00 Incl. VAT / £18.33 Excl. VAT

Salvaged from a French chandelier shop, these drops are elegant objects in their own right. Use as light catchers, tree decorations, or for refurbishing chandeliers and sconces.

Dimensions: 10 l x 2 w cm

Sold in bags of 5

4 in stock

Description

These opulent lead cut chandelier drops have many uses around the home, display or lighting. These vintage drops are popular with designers, easy to hang a set at a window, on the Christmas tree or for lighting projects.

Product code: 4150