Shop online with FREE UK shipping and fast International shipping * terms apply

Long Lead Prism Chandelier Drops

Product code: 4150

£22.00 Inc. VAT / £18.33 Excl. VAT

Salvaged from a French chandelier shop, these drops are elegant objects in their own right. Use as light catchers, tree decorations, or for refurbishing chandeliers and sconces.

Dimensions:  Overall: 12.6cm L x 2cm W x 0.8cm D

Rectangle Section: 10cm L to point x 2cm W x 0.8cm D

Octagon Section: 1.5cm W

Sold in bags of 5

4 in stock

Prefer to Hire ?

Available to commercial hire and film industry professionals


Description

These opulent lead cut chandelier drops have many uses around the home, display or lighting. These vintage drops are popular with designers, easy to hang a set at a window, on the Christmas tree or for lighting projects.

Product code: 4150